Industrial buildings

Havi Logistics

Poland

Investor
TEKTON
Architect
POMARIS
Usable area
5 000 m²
Scope
MEP
Havi Logistics

Roger Preston scope

  • Water and waste system
  • Fire protection installation
  • External gas and rainwater installation
  • Heating and cooling installation
  • Gas installation
  • Mechanical ventilation and air conditioning
  • Smoke ventilation system
  • Electrical and low current instalation